Sunday, October 25, 2009

Build construction started

Great progress with the table construction this past weekend! Jess and I worked out some general plans for the table and on Saturday acquired the material to begin building. With the help of Philip on Sunday the table began to take shape. Acrylic has been framed with LED light strip and mounted inside an aluminum U-channel frame. As time allows we will continue to work out details of the table and build it out.

I have tested the acrylic layer out with the vision system and it works great, though blob tracking was not great. I suspect its just a matter of isolating the IR inside an enclosure and probably more importantly tweaking settings in the vision system software to get the best out of our system. All in all things are going very well, expect some build photos in a while.

No comments:

Post a Comment